Twisted Timbers vs Untamed


card comparison

The back of a thoozie card.
StatTwisted TimbersUntamed
Height111 ft120 ft
Speed54 mph57 mph
Inversions35
Throughputest.1150 rph1100 rph
Build Costest.12 $m13.9 $m
Vintage20182019

Vintage is the reversed stat — the older ride wins. Every number here is the same one printed on the card; see /methodology for how Build Cost and Throughput are sourced.

The verdict

Untamed takes it 4–2, and the 2 Twisted Timbers does win are the whole of its case.

Twisted Timbers is a hybrid IBox Track (Hurler conversion) coaster at Kings Dominion, US, built by Rocky Mountain Construction. Untamed is a hybrid IBox Track (Robin Hood conversion) coaster at Walibi Holland, NL, built by Rocky Mountain Construction.

They come from the same drawing office: Rocky Mountain Construction. That makes the gaps below a question of brief and budget rather than engineering house style.

Both are hybrid-track, so nothing here is the usual steel-versus-wood argument in disguise.

They are near-contemporaries — 2018 and 2019 — so they were competing for the same riders when they opened.

Stat by stat

  • Height goes to Untamed at 120 ft against 111 ft — clearly ahead.
  • Speed goes to Untamed at 57 mph against 54 mph — ahead by a whisker.
  • Untamed takes Inversions 5 to 3.
  • Throughput goes to Twisted Timbers at 1,150 rph against 1,100 rph — ahead by a whisker.
  • Build Cost goes to Untamed at 13.9 $m against 12 $m — well clear.
  • Twisted Timbers (2018) beats Untamed (2019) to Vintage by a single season.

Want to run this matchup yourself?

Build a deck and duel it out for real.

Start collecting
Back to the full set